arXiv:2601.13832v1 Announce Type: new Abstract: To address the issues of high operational costs and low energy efficiency (EE) caused by the dense deployment of small base stations (s-BSs) in 5G ultra-dense networks (UDNs), this paper first constructs a multi-objective mathematical optimization model targeting maximizing EE and minimizing the number of active BSs. The model incorporates key constraints including BS operational state, user equipment (UE)-BS connection relationship, and load threshold, laying a theoretical foundation for the coordinated optimization of energy conservation and quality of service. Based on this model, an integrated solution combining UE-BS initial connection optimization and load-sharing based BS sleeping is proposed. In the initial connection phase, with comm…
arXiv:2601.13832v1 Announce Type: new Abstract: To address the issues of high operational costs and low energy efficiency (EE) caused by the dense deployment of small base stations (s-BSs) in 5G ultra-dense networks (UDNs), this paper first constructs a multi-objective mathematical optimization model targeting maximizing EE and minimizing the number of active BSs. The model incorporates key constraints including BS operational state, user equipment (UE)-BS connection relationship, and load threshold, laying a theoretical foundation for the coordinated optimization of energy conservation and quality of service. Based on this model, an integrated solution combining UE-BS initial connection optimization and load-sharing based BS sleeping is proposed. In the initial connection phase, with communication quality and BS load as dual constraints, efficient matching between UEs and optimal BSs is achieved through three sequential steps: communication feasibility screening, redundant connection removal, and overload load redistribution. This resolves the problems of load imbalance and difficult identification of redundant BSs in UDNs arising from unordered initial connections. In the BS sleeping phase, a BS sleeping index, comprehensively considering UE transferability and backup BS resources, is innovatively introduced to quantify BS dormancy priority. Through a closed-loop process involving low-load BS screening, adjacent BS load evaluation, and load sharing by two takeover BSs based on their capacity, accurate dormancy of redundant BSs and collaborative load migration are realized. Simulation results in a typical UDNs scenario demonstrate that, compared with the traditional baseline scheme, the proposed solution exhibits significant advantages in convergence speed, optimization of the number of active BSs, and EE improvement.