NEW PCB READY FOR TESTING

I had spent many hours checking continuity for all signals on the board and eliminating the chance of any shorts to adjacent pins. On the testbench I verified that all the outputs are producing correct pulses and the parity generation produces the proper pulses. The new PCB was installed on the 1130 system where I will do the final testing.

MANUAL LOAD AND DISPLAY TESTS

Using the rotary mode switch, I could set it to LOAD and push the Prog Start button to load the pattern in the console entry switches (CES) into the memory location set by the Instruction Address Register (IAR). Turning the mode switch to DISPLAY and pushing the Prog Start button will read memory and display its output on the Storage Buffer Register (SBR) lights.

To set the IAR to a …

Similar Posts

Loading similar posts...

Keyboard Shortcuts

Navigation
Next / previous item
j/k
Open post
oorEnter
Preview post
v
Post Actions
Love post
a
Like post
l
Dislike post
d
Undo reaction
u
Recommendations
Add interest / feed
Enter
Not interested
x
Go to
Home
gh
Interests
gi
Feeds
gf
Likes
gl
History
gy
Changelog
gc
Settings
gs
Browse
gb
Search
/
General
Show this help
?
Submit feedback
!
Close modal / unfocus
Esc

Press ? anytime to show this help