Reflecting Pool repairs ordered after algae, peeling coating (opens in new tab)
Washington’s Lincoln Memorial Reflecting Pool is set to be drained again after algae growth and peeling blue coating appeared within weeks of a renovation that cost about $14.7 million to $16 million, with estimates varying by source. DC Water issued a permit to drain the 2,000-foot, or 609-meter, rectangular pool, and the repair company said it would fix the pool under warranty. President Trump declared the renovation complete on June 6 and blamed the coating damage and algae on vandals, all...
Read the original article