arxiv.org

Geospatial sensitivity of transmission-constrained ACOPF to generator retirement (opens in new tab)

The US faces a growing resource adequacy challenge: new loads are being added at unprecedented scale while aging generating assets are being retired. In transmission-constrained grids, it is difficult to determine which units can be safely retired and which cannot be retired and instead require lifetime extensions until new generation can be built. Historically, this analysis was prohibitively time consuming. Transmission-constrained AC optimal ...

Read the original article
Sign in to keep reading the full article.

Keyboard Shortcuts

Navigation

Next / previous post
j/k
Open post
oorEnter
Preview post
v

Post Actions

Love post
a
Like post
l
Dislike post
d
Undo reaction
u
Save / unsave
s

Recommendations

Add interest / feed
Enter
Not interested
x

Go to

Home
gh
Interests
gi
Feeds
gf
Likes
gl
History
gy
Changelog
gc
Settings
gs
Discover
gb
Search
/

General

Show this help
?
Submit feedback
!
Close modal / unfocus
Esc

Press ? anytime to show this help