Difference between revisions of "Zdakovsky Bridge" (opens in new tab)
← Older revision Revision as of 21:42, 7 June 2026 (One intermediate revision by the same user not shown)Line 14: Line 14: The Žďákovský Bridge was reconstructed between 2015 and 2017. The main objective of the reconstruction was to replace the bridge closures, restore the waterproof insulation of the bridge deck, replace the cornice beams and railings, restore the anti-corrosion protection of the steel structure and renovate the concrete parts of the bridge. The Žďákovský Bridge was reconstr...