Inside the belly of the beast: A technical walk through Intel's 18A production facility at Fab52
theregister.com·20h·
Discuss: Hacker News

deep dive Not long after rejoining Intel in 2021, former CEO Pat Gelsinger announced an ambitious plan to reinvent the chipmaker as a contract semiconductor manufacturing powerhouse.

Four years later, Gelsinger has moved on, but his dream is still very much alive. Earlier this summer, Intel quietly began operating the first of two new leading-edge wafer fabs located at its Occotilo manufacturing plant in Chandler, Arizona.

Inside the belly of the beast

Last week, during Intel’s Tech Tour press event, El Reg had the opportunity to tour Fab52, where mass production of chips based on the company’s new 18A process node is already underway.

The facility, which broke ground in late 2021, comprises 600,000 cubic meters of concrete and 110 tons of steel. Access to the heart of the f…

Similar Posts

Loading similar posts...